Products
A partner you can trust:
Production has always been the beating heart of our company: starting from liquid aluminium, our presses give life to products of extraordinary complexity and precision in tens of seconds. Subsequently, our mechanical processing lines allow us to process the pieces to deliver the product ready to be assembled to customers.
Our operations department mainly focuses on:
Standardization: by developing a standardized operating process, Foma guarantees constant quality in the production of components, thus reducing errors and defects in the production process and improving the satisfaction of our customers.
Continuous Improvement: by continually assessing and improving its operational process, Foma can stay up to date with the latest industry standards and best practices, which can help maintain a competitive edge in the marketplace.
Cost Savings: helps Foma identify cost saving opportunities by reducing waste, improving efficiency, and optimizing production processes.
MANUFACTURERS OF EXCELLENCE
01
Mould construction
12 milling cutters for production and mold maintenance
02
Aluminium alloy casting
We manage up to 7 different alloys at the same time
03
Die casting
34 fully automated islands up to 3500 tons
04
Sandblasting
In steel or zinc
05
Machining
Over 50 fully automated CNCs
06
Washing
10 washing systems
07
Consignment
Automated warehouses for maximum efficiency
SYSTEM QUALITY
Competitiveness has an indispensable social value, because it means growth, employment and wellbeing. Renewal and quality are watchwords for offering future expectations…
- The primary objective of the FOMA Aluminium Division quality system is maximum customer satisfaction.
- The quality organization is based on IATF (International Automotive Task Force)
- principles Approach for key processes
- Lean factory
- Process owner method management
Metrology
We have two metrology rooms with more than 20 Zeiss machines
X Rays
4 machines and 2 of them can do also the tomography
3D Scanner
Analysis of the geometry and comparison with the mathematical model of the component
Cleanliness Room
Residual dirt analysis after washing